Do I Need a Structural Engineer's Report After Pool Fill in the Southern Highlands? (Certification for Building or Sale)

Southern Highlands Pool Removals is an independent referral service and does not perform or contract for the advertised work. Your enquiry may be referred to an independent contractor. Where licensing is required, the contractor's identity and licence details will be provided before you accept a quotation or enter a contract.

An engineer’s report is not an automatic part of every pool removal in NSW. Whether you need one turns on two things: what the conditions of your complying development certificate (CDC) or development application (DA) say, and what you plan to put on the filled area later. If the area will stay as lawn or garden, the record that matters is the approval, its conditions and your fill and disposal receipts; ask the certifier whether anything more is required. If a slab, extension, granny flat or shed with footings may go over it, expect whoever designs or certifies that new work to want an engineer’s view of the ground.

What the removal approval itself asks for

  • Compacted fill to ground level. Under the NSW Demolition Code, where demolition removes a swimming pool, the piping must be removed and the site restored to the adjoining ground level with compacted fill (NSW Planning, Demolition of buildings).
  • Certified fill and receipts. Kiama Council’s fact sheet on the state rule says only certified clean fill or certified excavated natural material may be used, well compacted, and that owners should keep disposal and fill receipts that show the property address (Kiama Council, Removal of a swimming pool). Wingecarribee and Wollondilly publish no equivalent sheet that this site could find.
  • Conditions can add more. Neither source names an engineer’s report as a standard requirement, but the conditions on an individual CDC or DA can. Read them, or ask the certifier, before the job is quoted, so any testing is planned while the fill goes in.

When an engineer is likely to be involved

Building over the filled area

AS 2870-2011, Residential slabs and footings, covers site classification and footing design for houses and similar buildings (Standards Australia store). The Housing Industry Association’s summary of the standard notes that one section of the standard deals with filled sites (HIA, Residential slabs and footings). A filled pool is ground the footing designer will need to understand, so tell the engineer or certifier for the new work that it is a filled excavation and give them the receipts and any test results. The building over a filled-in pool guide covers that next step.

In Bargo, Picton and Wilton, which are declared Mine Subsidence Districts, building over the area later may also need approval from Subsidence Advisory NSW (Subsidence Advisory NSW, Mine Subsidence Districts).

A partial fill-in

Kiama’s fact sheet says leaving all or part of the shell in the ground would need a DA and would likely lead to a notation on the title identifying buried waste. If any structure might later go over a retained shell, raise it with an engineer before design starts rather than after.

A pool hard against a house, wall or boundary

Where the pool sits close to a building, retaining wall or boundary, an engineer can say whether removing the shell or changing the ground level puts those at risk. Ask the contractor at inspection whether they think this applies.

Selling the property

This site found no NSW rule that requires an engineer’s report when a property with a filled pool is sold. A buyer or their adviser may still ask what was done. The useful file is the CDC or DA and its conditions, the fill and disposal receipts, any compaction results, and confirmation that council has updated the Swimming Pool Register. The guide to selling a house with an old pool covers the sale side.

Report, test results or geotechnical investigation?

These are often confused. Compaction test results record how well the layers were compacted as they went in. A geotechnical investigation looks at the soil itself, usually by boreholes or test pits, and is covered in the geotechnical report guide. An engineer’s report or letter interprets what is known and states what the ground is suitable for. Which of these you need is set by the approval conditions and by whoever certifies any later building.

What it costs

No verified published price exists for compaction testing, a compaction certificate or an engineer’s or geotechnical report after a pool fill, and this site does not estimate one. The pool removal cost guide lists this as a gap. Ask for testing and any engineer’s sign-off to be priced as separate lines in the removal quote.

What to ask the contractor before work starts

  • whether the approval conditions require compaction testing or an engineer’s sign-off, and who arranges it
  • the fill type, its source and the delivery dockets
  • layer thickness and compaction method, and at what stages any testing is done
  • copies of all results, receipts and certificates in writing

The pool excavation and backfill page sets out how the fill and compaction should be done.

Frequently asked questions

Do I need an engineer’s report if the area will only be lawn?

Often not, but it depends on your CDC or DA conditions. Ask the certifier what the conditions require, and keep the fill and disposal receipts either way.

Not by itself. AS 3798-2007 is a guideline on earthworks, currently pending revision, that engineers and certifiers often reference (Standards Australia, AS 3798-2007); the binding requirements come from your approval conditions and the engineer’s specification.

Can the fill be assessed after the job is finished?

An engineer can investigate later, but testing while the layers go in avoids digging back into finished ground. If a building over the area is likely, say so before the removal is quoted.

How much does an engineer’s report cost?

No verified published figure was found for this after a pool fill. Ask the engineer for a written fee for your site.

Request a quote and say whether you may build over the area later; your enquiry may be passed to an independent licensed contractor who inspects and quotes in their own name.

Sources

Last reviewed 15/11/2026. How these pages are researched and corrected.

More guides

Does Removing a Pool Add Value to Your Property in the Southern Highlands?

Does removing a pool add value in the Southern Highlands? What is known, what is not, the NSW pool rules at sale, and…

View

Exempt Development Pool Removal: When No Approval Is Needed

When pool removal in NSW is exempt development and needs no approval, when it needs a CDC or DA instead, and how…

View

Pool Removal FAQ, Southern Highlands & Wollondilly (2026)

Pool removal FAQ for Wingecarribee and Wollondilly: published costs, CDC or DA, heritage, mine subsidence, the pool…

View

More on this topic

Request a quote

Tell us about the job and an independent local contractor can quote it.

Get a Quote