A pool removal usually involves an excavator, a hydraulic breaker to break up the shell, trucks or skips to take rubble away, a float to bring the machine to site, and compaction equipment for the fill. Which machines turn up depends on access, the pool’s construction and what is underneath it, and that is a large part of why two quotes for similar pools differ. No public source sets a standard machine size or number of days for a Highlands pool, so ask the contractor to name the plant in the quote.
The main plant
| Plant | What it does | What to ask |
|---|---|---|
| Excavator | Digs around and under the shell, loads trucks, places fill. Smaller machines fit tighter access but move less per hour | What size machine, and will it fit through the gate or side access? |
| Hydraulic breaker | Fitted to the excavator to break concrete and rock | Is breaking included, and how is rock priced if found? |
| Tipper truck or skip | Carts rubble and spoil to a facility; returns with fill | How many loads, to which facility, and where will trucks stand? |
| Float (low loader) | Delivers the excavator to the property | Is delivery and pick-up included? |
| Compactor (plate or roller) | Compacts each layer of fill | What method and layer thickness, and who checks it? |
| Pump | Removes water from the pool and the excavation | Where will the water be discharged? |
The pool excavation and backfill service page covers the earthworks side in more detail.
Access on Highlands blocks
Access decides the machine more than anything else. On an established Highlands garden that means gate and side widths, old stone walls, steps and mature trees; on acreage it means long gravel or earth driveways, cattle grids and soft paddocks. Wet ground is common: the Bureau of Meteorology’s Bowral (Parry Drive) station recorded a mean of 95 days a year with at least 1 mm of rain over 1961 to 2014, before the station closed (BOM 068102). Ask whether ground protection mats will be used, what happens if rain softens the access mid-job, and who repairs any damage.
If the easiest route means taking down a fence panel or crossing a neighbour’s land, agree it in writing before the job is booked. On larger blocks, the rural property access guide goes further, and the site inspection guide explains what the contractor should check before quoting.
Safety rules that shape the job
SafeWork NSW’s Excavation work code of practice treats construction work in or near a trench deeper than 1.5 metres as high risk construction work that needs a Safe Work Method Statement (SafeWork NSW, Excavation work code of practice (PDF, January 2020)). The same code lists underground services (gas, water, sewerage, telecommunications and electricity) and the placement of excavated material and plant near the edge among the hazards to manage, and requires information about underground essential services to be obtained before the digging starts. Expect the contractor to ask where pool pipes, power to the pump and any septic lines run.
If the removal is done under a complying development certificate, the conditions include demolition hours of 7 am to 5 pm Monday to Saturday with none on Sundays or public holidays, work to AS 2601-2001, erosion and run-off controls, a waste management plan and notice to neighbours (NSW Planning, Demolition of buildings). Old fibro near the pool may contain asbestos, which SafeWork NSW says must be removed by a licensed professional when friable or over 10 m² of bonded material (SafeWork NSW, Asbestos), so suspect material is tested and dealt with before any machine breaks it up.
Where the trucks go
In Wingecarribee, the council’s Resource Recovery Centre is at 177 Berrima Road, Moss Vale, and accepts inert building waste such as concrete, soil and fill (Wingecarribee, Resource Recovery Centre). In Wollondilly, REMONDIS runs the Picton Resource Recovery Facility at 67 Wonga Road (REMONDIS Picton RRF), and the Bargo tip closed on 8 June 2025 (Wollondilly, Bargo Waste Management Centre). The rubble disposal guide covers gate fees and recycling; the cost guide shows how disposal fits the published price ranges.
What the quote should name
- The excavator size and attachments, and whether a float is included.
- How rock breaking is charged.
- Truck or skip numbers, the destination facility and how disposal is priced.
- Ground protection and who repairs access damage.
- The compaction method and any testing.
- Working hours and the expected programme.
Frequently asked questions
Why does the size of the excavator matter?
A larger machine generally moves material faster but needs wider, firmer access. The right size is the largest that can safely reach the pool without damaging the property, which the contractor judges at the inspection.
Can work happen on weekends?
Under a CDC, demolition can run 7 am to 5 pm on Saturdays but not on Sundays or public holidays (NSW Planning). A DA sets its own conditions.
Who pays if a machine damages something?
That is the contractor’s risk to insure. Ask for a public liability certificate of currency before work starts, and photograph driveways, paths and fences beforehand.
Request a quote and include photos of the access route from the street to the pool.
Sources
- SafeWork NSW, Excavation work code of practice (PDF, January 2020): high risk construction work, underground services, plant near edges (checked 15/11/2026)
- NSW Planning, Demolition of buildings: CDC conditions for demolition (checked 15/11/2026)
- SafeWork NSW, Asbestos: licensed removal thresholds (checked 15/11/2026)
- Bureau of Meteorology, Bowral (Parry Drive) 068102: days of rain (checked 15/11/2026)
- Wingecarribee Shire Council, Resource Recovery Centre: Moss Vale facility (checked 15/11/2026)
- REMONDIS, Picton Resource Recovery Facility: Picton facility (checked 15/11/2026)
- Wollondilly Shire Council, Bargo Waste Management Centre: closure (checked 15/11/2026)