The best use of an old pool footprint depends on what it will carry. A lawn or garden bed asks little of the fill; paving asks more; a shed, studio or slab needs the fill designed and tested for it from the start. Decide on the end use before the removal is quoted, because it changes the fill, the compaction and sometimes the approval pathway.
Choose the end use before the quote
Under the NSW Demolition Code, a removed pool’s piping must come out and the site be restored to the adjoining ground level with compacted fill (NSW Planning, Demolition of buildings). That baseline suits lawn and planting. If anything heavier may follow, tell the contractor and the certifier first so the engineer can set the fill and any testing up front; see building over a filled-in pool.
The choice also bears on full versus partial removal. Kiama Council’s fact sheet on the state rule says leaving all or part of the shell in place needs a DA, could not be done as complying development, and is likely to lead to a notation on the title identifying buried waste (Kiama Council, Removal of a swimming pool fact sheet). A buried shell floor also sits under whatever you plant or build. The full pool removal page sets out the alternative.
The main options, and what each needs
| End use | What it needs from the removal | Points to settle |
|---|---|---|
| Lawn | Compacted certified fill, a topsoil layer, a surface graded level with the surrounding ground | Topsoil depth and source; who seeds or turfs, and when |
| Garden beds or orchard | As for lawn, with a deeper planting layer where roots will go | Fill free of rubble and shell pieces; weed-free topsoil |
| Paving or an entertaining area | Fill compacted to a standard the paver or engineer specifies | Whether the pavement base and fall are part of the same job |
| Shed, studio, slab or pool house | Fill designed and tested for the load, or footings taken through to natural ground | Engineer’s specification before backfill starts |
Kiama’s sheet says only certified clean fill or certified excavated natural material may go in, with no demolition waste or pieces of the shell or coping (Kiama Council fact sheet). Your own approval conditions are the rule for your property. Some settlement of new fill is possible however well it is placed; the soil compaction and settlement guide explains what to watch for before paving or building.
Highlands points that change the design
Heritage. Wingecarribee says alterations and additions to heritage items and within heritage conservation areas require consent, subject to exceptions, and that minor works treated as exempt still need written permission from Council before work starts (Wingecarribee, Heritage and Development). Conservation areas are listed in Bowral, Mittagong, Moss Vale, Berrima, Bundanoon and Burradoo, among others (Wingecarribee, Heritage Items, Sites and Areas). A new pergola, paving or outbuilding on such a property is worth raising with Council early; the heritage landscaping guide goes further.
Mine subsidence. Bargo, Picton and Wilton are declared Mine Subsidence Districts, and Hill Top, Yerrinbool and Tahmoor sit inside the Bargo district boundary on Subsidence Advisory’s map (Subsidence Advisory NSW, Mine Subsidence Districts; Bargo district map (PDF)). Approval is needed before building a structure in a district, so check with Subsidence Advisory NSW before planning a shed or studio over the old pool.
Frost. Moss Vale AWS (068239) records a mean 48.8 days a year at or below 2 °C (temperatures 2001 to 2026) (BOM, Moss Vale AWS). Cold air tends to pool in hollows, so a filled area finished below the surrounding lawn is the worst spot for frost-tender plants. Grade it level and choose hardy plants for the first winter.
Weeds in new soil. Wingecarribee warns that contaminated soil, mulch and fill can bring in new weeds and advises buying from trusted local suppliers (Wingecarribee, Weed identification and control).
What the fill, topsoil and finishing add to the job is covered in the pool removal cost guide.
FAQs
Can I plant large trees over the old pool?
That depends on the fill depth and quality and on what else is nearby. Trees need a deep, uncompacted root zone, so plan the planting position before backfill and ask the contractor how the planting area will be prepared.
Can I put a garden shed over the filled area?
Possibly, but have an engineer set the fill and footing requirements before backfill, and check whether the shed needs approval, including from Subsidence Advisory NSW in a declared district.
Do I need approval for new paving or a pergola in a conservation area?
Ask Wingecarribee first: it says works within heritage conservation areas generally need consent and that exempt minor works still need its written permission before starting.
Request a quote for a removal planned around the end use you want; your enquiry may be passed to an independent licensed contractor who inspects and quotes in their own name.
Sources
- NSW Planning, Demolition of buildings: piping removal and compacted fill under the Demolition Code. Checked 15/11/2026.
- Kiama Council, Removal of a swimming pool fact sheet (PDF, 2021): partial removal, title notation and fill material (Kiama’s explanation of the state rule). Checked 15/11/2026.
- Wingecarribee, Heritage and Development and Heritage Items, Sites and Areas: heritage consent and conservation areas. Checked 15/11/2026.
- Subsidence Advisory NSW, Mine Subsidence Districts and Bargo district map (PDF): districts and approval for structures. Checked 15/11/2026.
- BOM, Moss Vale AWS climate statistics: frost days. Checked 15/11/2026.
- Wingecarribee, Weed identification and control information: weeds in soil, mulch and fill. Checked 15/11/2026.