Frost, Ground Heave and Pool Backfill in the Southern Highlands

Southern Highlands Pool Removals is an independent referral service and does not perform or contract for the advertised work. Your enquiry may be referred to an independent contractor. Where licensing is required, the contractor's identity and licence details will be provided before you accept a quotation or enter a contract.

The Southern Highlands get regular winter frosts, and frozen or saturated fill is harder to place and compact well. That is the practical link between frost and pool backfill: the risk is mostly about the weeks the fill goes in, and about the fill being the right material, compacted in layers, so it does not hold water near the surface. No published source this site found measures frost depth or frost heave in Highlands soils, so how much heave matters on your block is a question for the engineer or certifier, not a figure this page can give.

How often it freezes

The Bureau of Meteorology’s Moss Vale AWS station (068239, 678 m, still open) averages 48.8 days a year at or below 2 °C and 24.7 days at or below 0 °C, with a July mean minimum of 2.6 °C and a lowest recorded temperature of -6.3 °C, from temperatures recorded 2001 to 2026 (BOM, Moss Vale AWS).

The older Bowral (Parry Drive) station (068102, 690 m) closed in January 2015. In its 1965 to 2015 temperature records it averaged 51.6 days a year at or below 2 °C, 14.3 of them in July, and 24.7 days at or below 0 °C; its lowest recorded temperature was -11.2 °C (BOM, Bowral (Parry Drive)). The same station recorded a mean of 95.0 days a year with at least 1 mm of rain.

These are screen-level air temperatures at two stations. They do not tell you how cold the ground gets in a particular backyard, and there are no BOM figures in this site’s research for villages such as Robertson or Bundanoon.

What frost heave is

Water expands as it freezes. In fine, wet soil, freezing can draw in more water and lift the surface, then let it settle on thawing; this is frost heave. It is most associated with places where the ground freezes deeply and for long periods. In the Highlands the more common practical problem for a new fill is simpler: wet, frozen or poorly compacted material placed in winter that later settles unevenly. The settlement guide covers that in more depth.

What the rules say about the fill

  • The NSW Demolition Code requires the site of a removed pool to be restored to the adjoining ground level with compacted fill (NSW Planning, Demolition of buildings).
  • Kiama Council’s fact sheet on the state rule allows only certified clean fill or certified excavated natural material, well compacted, with no demolition waste or pool shell pieces (Kiama Council, Removal of a swimming pool). Wingecarribee and Wollondilly publish no equivalent sheet that this site could find, so your approval conditions set the rule.
  • AS 3798-2007 is the earthworks guideline engineers and certifiers often reference; it is not a law by itself and is listed as pending revision (Standards Australia, AS 3798-2007).

The material type, layer thickness and any testing are the engineer’s or certifier’s specification for your site. This page does not prescribe a fill recipe.

Working in a Highlands winter

Ask the contractor, before you sign:

  • whether they will place fill on frosty mornings or after heavy rain, or stop and wait
  • how stockpiled fill is kept dry, for example covered
  • whether each layer is compacted, and tested where required, before the next goes on
  • how standby days for frost or rain are charged

Some owners prefer to remove a pool outside the coldest months to reduce these interruptions. The best time of year guide and the wet-season scheduling guide cover timing.

After the first winter

Walk the area in spring. Look for humps, hollows, cracked paving or wet patches that were not there when the job finished. If you see them, photograph and mark the area, keep heavy loads and paving off it, and raise it with the contractor in writing. If you plan to build over the area, an engineer should assess it first. The pool excavation and backfill page explains what a good backfill quote contains.

Frequently asked questions

How many frost days does the Southern Highlands get?

Moss Vale AWS averages 24.7 days a year at or below 0 °C and 48.8 days at or below 2 °C (2001 to 2026), per the Bureau of Meteorology.

Can the clay dug out of the hole go back in?

Only if your approval conditions allow it. Kiama’s explanation of the state rule allows only certified clean fill or certified excavated natural material, so ask the certifier before assuming site soil can be reused.

Can a pool be backfilled in winter?

Yes, but frost and wet ground make good compaction harder. Ask how the contractor handles cold, wet days and how standby is charged.

Is a partial fill-in affected by frost differently?

The same fill and compaction questions apply inside a retained shell. A partial fill-in often needs a DA; see partial pool removal and fill-in.

Request a quote and say when you would like the work done; your enquiry may be passed to an independent licensed contractor who inspects and quotes in their own name.

Sources

Last reviewed 15/11/2026. How these pages are researched and corrected.

More guides

Geotechnical (Soil Investigation) Reports After Pool Fill-In: When You Need One and What It Covers

When a geotechnical or soil report is needed after a pool fill-in in NSW: building over the fill, approval…

View

Section 68 Approval and Pool Removal in Wingecarribee: When It Applies

Section 68 approval and pool removal in Wingecarribee: why the demolition itself goes through a CDC or DA, and when…

View

Pool Removal on Heritage-Listed Properties (Southern Highlands)

Removing a pool from a heritage-listed Southern Highlands property: local items under Wingecarribee LEP 2010, State…