A pool on a short-stay rental carries the same legal obligations as any NSW pool, plus a listing that must match what guests find when they arrive. Removing it ends the barrier and certificate obligations once it can no longer hold water, but the removal still needs the right approval, a gap in bookings long enough for the works, and an updated listing. Whether a pool earns its keep for a particular Highlands rental is a business judgement no public source answers; this page covers the rules and the order of steps.
The pool rules that apply while the pool holds water
The Swimming Pools Act 1992 covers pools on sites with a residential building, a movable dwelling or tourist and visitor accommodation. Any pool capable of holding more than 30 cm of water needs a child-resistant barrier at all times and must be on the Swimming Pool Register (NSW Government, pool owner obligations). The same page says a landlord must give a residential tenant a certificate of compliance or an occupation certificate, and that a non-compliance certificate cannot be used for renting.
Wingecarribee Shire Council says owners of listed tourist and visitor accommodation types with a pool, such as a bed and breakfast, farm stay or serviced apartment, must hold a valid certificate at all times, and that council inspects those pools at no more than three-year intervals (Wingecarribee, Swimming Pool Fencing). That page does not mention short-term rentals by name, so ask council (or Wollondilly Council for Picton, Tahmoor, Bargo and Wilton) how a short-stay let is treated. Wingecarribee’s 2026/27 schedule lists $165 for a first barrier inspection and $110 for later inspections (Wingecarribee Fees and Charges 2026-2027).
The unused pool hazards guide covers what council can require of a pool that has been left to deteriorate.
What NSW asks of short-term rental hosts
Every short-term rental property must be on the STRA Register, and hosts must meet fire safety standards that include an evacuation plan and interconnected smoke alarms (NSW Planning, Short-term rental accommodation). The host Code of Conduct says premises “must be provided in a state consistent with how it is represented in advertisements” (NSW Government, host obligations). Neither page mentions pools. In practice, the listing should stop showing a pool before the first stay in which guests cannot use it, including stays while works are under way.
Keeping it or removing it
The questions that decide it are specific to the property:
- How many months guests actually swim. Highland winters are cold: the Bureau of Meteorology’s Moss Vale AWS station (068239) records a mean of 24.7 days a year at or below 0 °C and a July mean minimum of 2.6 °C (temperatures 2001 to 2026).
- What the pool costs to keep safe and certified, including barrier inspections, repairs, chemicals, heating and the call-outs that happen mid-booking.
- What guests say. Reviews mentioning the pool, good or bad, are the only booking evidence most hosts have. No published data shows how removing a pool affects Highlands bookings.
Approval and timing around bookings
Removal is exempt development only where the pool could itself have been built as exempt development; otherwise it needs a complying development certificate (CDC) or a development application (DA) before work starts (NSW Planning, Demolition of buildings). Wingecarribee says a pool that was originally approved needs prior approval from council or an accredited certifier to remove. A partial fill-in often needs a DA, and Kiama Council’s explanation of the state rule says council may note buried pool material on the title (Kiama Council fact sheet, 2021); confirm with council or a certifier.
Under a CDC, demolition runs 7 am to 5 pm Monday to Saturday, with none on Sundays or public holidays, and neighbours must be told before work starts (NSW Planning page above). No public source gives a standard number of days on site, so ask the contractor for a written programme covering approval, works and reinstatement, and block those dates in the booking calendar with a margin for wet weather. The full pool removal service page explains what is involved, and the cost guide sets out published price ranges and what drives them.
After the pool is gone
- Ask council to update the Swimming Pool Register; the register guide explains the step.
- Update the listing’s amenities, photos and description, and check the STRA Register entry.
- Tell the insurer in writing; the pool removal and home insurance guide covers what to ask.
- Keep the approval, disposal receipts and fill receipts, which Kiama’s fact sheet advises owners to hold.
Frequently asked questions
Do I have to update the listing before the pool is removed?
The host Code of Conduct requires premises to match how they are represented in advertisements (NSW Government, host obligations). If guests booked expecting a pool, contact them through the platform before the works start.
Does removing the pool affect STRA registration?
The NSW Planning STRA page ties registration to fire and safety requirements and does not mention pools (NSW Planning, STRA). Check that the register entry still describes the property accurately once the pool is gone.
When is the best time of year to remove a rental’s pool?
There is no published best month. Choose a gap long enough for approval and works, remember that CDC demolition hours exclude Sundays and public holidays (NSW Planning), and ask how the contractor schedules backfill in frost or heavy rain.
Request a quote and include the dates the property is free of bookings.
Sources
- NSW Government, Owning a pool or spa: your obligations: who the Act covers, barrier, register and rental certificate rules (checked 15/11/2026)
- Wingecarribee Shire Council, Swimming Pool Fencing: tourist and visitor accommodation inspections, prior approval to remove (checked 15/11/2026)
- Wingecarribee Fees and Charges 2026-2027 (PDF): barrier inspection fees (checked 15/11/2026)
- NSW Planning, Short-term rental accommodation: STRA Register and fire safety standard (checked 15/11/2026)
- NSW Government, Host obligations: premises consistent with advertisements (checked 15/11/2026)
- NSW Planning, Demolition of buildings: approval pathways and CDC conditions (checked 15/11/2026)
- Kiama Council, Removal of a swimming pool fact sheet (PDF): one council’s explanation of the state rule (checked 15/11/2026)
- Bureau of Meteorology, Moss Vale AWS 068239: frost days and July minimum (checked 15/11/2026)