Southern Highlands Pool Removals is an independent referral service and does not perform or contract for the advertised work. Your enquiry may be referred to an independent contractor. Where licensing is required, the contractor's identity and licence details will be provided before you accept a quotation or enter a contract.

Basalt country changes a pool removal in two ways. Rock may sit beside or under the shell, which slows the dig and is rarely visible at the inspection, and the hole has to be refilled with material a certifier or engineer will accept, not a mix of broken rock and soil. How deep the rock sits under any one pool is unknown until the digging starts, so a good quote says how rock will be handled and charged.

Where the basalt is

The NSW Threatened Species Scientific Committee describes the Robertson Basalt Tall Open-forest as restricted to “moist, elevated areas on fertile soils associated with Tertiary volcanics on the Robertson Plateau”, between 650 and 850 m above sea level, where mean annual rainfall is 1,000 to 1,450 mm (NSW Scientific Committee, final determination, 2016 (PDF)). That is the country around Robertson and the plateau villages.

The state’s eSPADE soil information system shows mapped soil landscapes and recorded soil profiles for much of eastern NSW, which gives a general picture. It cannot say what is under a particular pool; only digging or a site investigation does.

The same determination says much of the remaining forest is on private land. If access for machines would mean clearing native trees or understorey, ask Wingecarribee Shire Council what approval is needed before anything is cut.

What rock does to the removal

  • Breaking takes longer. Concrete and rock are broken with a hydraulic breaker on the excavator rather than dug with a bucket. Ask whether the quote includes rock breaking, prices it as a rate, or treats it as a variation.
  • Deep digs carry extra safety rules. SafeWork NSW’s code of practice treats construction work in or near a trench deeper than 1.5 metres as high risk construction work that needs a Safe Work Method Statement, and lists the fall or dislodgement of earth or rock among excavation hazards (SafeWork NSW, Excavation work code of practice (PDF, January 2020)). The deep end of a pool can exceed that depth.
  • Water. Plateau rainfall is high, and rock can hold water against the shell. Ask how the contractor will manage water in the hole before backfill.

The rural property access guide covers getting machines and trucks onto larger plateau blocks.

Backfilling in rocky ground

Under the Demolition Code, where a pool is removed, the piping must go and the site must be restored to the adjoining ground level with compacted fill (NSW Planning, Demolition of buildings). Kiama Council’s explanation of the state rule says only certified clean fill or certified excavated natural material (ENM) may be used, well compacted, with no demolition waste or pool shell pieces (Kiama Council fact sheet, 2021). That is Kiama’s document, not Wingecarribee’s, so confirm the fill requirements in your own approval.

Angular rock and rubble leave voids. CSIRO’s footing guide notes that backfilled trenches can become watercourses, “particularly where broken rubble is used as fill” (CSIRO, Foundation Maintenance and Footing Performance, 2024 (PDF)). Whether any rock from the dig can go back in, and at what size, is a question for the engineer or certifier and the approval conditions. AS 3798, the earthworks guideline engineers often reference, is guidance rather than law (Standards Australia, AS 3798-2007). The soil compaction and settlement guide explains layering and testing, and the pool excavation and backfill service page sets out what the scope should cover.

Rock that leaves the site

Rock not used on site has to be carted. Wingecarribee’s Moss Vale Resource Recovery Centre at 177 Berrima Road accepts inert building waste such as concrete, soil and fill (Wingecarribee, Resource Recovery Centre); its 2026-2027 schedule lists Inert - Mixed at $568 per tonne and has no separate clean rock or concrete line, so ask how a clean load is charged (Wingecarribee RRC fees 2026-27 (PDF)). Heavy loads mean more truck trips, so ask the quote to state where spoil goes and how it is priced. Published whole-job ranges are in the cost guide.

Frequently asked questions

How do I know if there is rock at pool depth?

Old construction photos or plans can help, and the contractor will look at the surrounding ground at the inspection. Neither settles it, so ask for the quote to say what happens if rock is found.

Can basalt from the dig be reused?

Rock can often be useful elsewhere on a rural block, for example under a track or as landscape stone. Whether it can go back into the pool excavation depends on the approval and the engineer; Kiama Council’s explanation of the state rule allows only certified clean fill or ENM (Kiama Council fact sheet).

Is Robertson in a heritage conservation area?

Robertson is not among the 17 conservation areas Wingecarribee lists, although individual heritage items may still apply to a property (Wingecarribee, Heritage Items, Sites and Areas). Council’s heritage planning proposal, which has Robertson evidence sheets, could change that list (NSW Planning Portal, PP-2024-2040), so ask Council whether a property is listed or proposed. Reactive clay ground elsewhere in the shire is covered in the clay soil guide.

Request a quote and mention any rock you know of near the pool.

Sources

Last reviewed 16/11/2026. How these pages are researched and corrected.

More guides

Pool Removal on Southern Highlands Clay Soils

Reactive clay swells wet and shrinks dry. What that means for the fill, drainage and compaction when a pool is…

View

Conservation Area Pool Removal, Southern Highlands

Removing a pool in one of Wingecarribee's 17 heritage conservation areas: which towns they cover, how the approval…

View

Reading a Pool Removal Contract: Clause-by-Clause

What a NSW pool removal contract should say, clause by clause: scope, approval, asbestos, fill, waste, variations,…

View

More on this topic

Request a quote

Tell us about the job and an independent local contractor can quote it.

Get a Quote