A site inspection is where the contractor sees what a phone call and a few photos cannot: how a machine and trucks will reach the pool, what is buried or built around it, whether old materials might contain asbestos, and which approval the job is likely to need. It is the basis for a written quote you can compare line by line. How long the visit takes, and whether there is any fee for it, are the contractor’s terms, so ask when you book.
What the contractor looks at
- The pool. Type (concrete, fibreglass, vinyl-lined or above-ground), size, condition, the coping and surrounds, and where the pump and filter sit.
- Access. Side paths, gates, driveways and any internal track, turning room for trucks, and where rubble will be loaded. On larger blocks see the rural access guide.
- Services. Power, water, gas and drainage near the pool. A Before You Dig Australia enquiry is free, but its plans are “indicative only” and may not show detail inside your property boundary, so it suggests a skilled locator for private lines (BYDA, For homeowners). Mention any septic tank, trenches, irrigation or power runs to sheds.
- Nearby buildings, walls and trees. Footings close to the pool, retaining walls, and large trees whose roots may be in the dig; the large trees guide covers when an arborist is needed.
- Ground. Rock beside or under the shell is rarely visible, so ask how hard digging will be charged.
- The approval pathway. Demolition is exempt only where the structure could itself be built as exempt development; detached development “including garages and swimming pools” can usually be demolished under a CDC (NSW Planning, Demolition of buildings). Wingecarribee says all demolition on a heritage site requires Council consent (Wingecarribee, Heritage and Development), and Bargo, Picton and Wilton are declared Mine Subsidence Districts (Subsidence Advisory NSW).
Asbestos checks
Old pump sheds, fences and surrounds are where asbestos tends to turn up. SafeWork NSW says asbestos cement sheeting was commonly used from the 1940s to the late 1980s, that a licensed professional must remove friable asbestos and more than 10 m² of bonded asbestos, and it recommends a licensed professional for any amount (SafeWork NSW, Asbestos). For buildings built before 1987, a CDC can only be approved if asbestos can be safely removed (NSW Planning page above). The contractor is not an asbestos assessor, but a careful one will flag fibro and price testing or name it as an exclusion. If an older property’s quote says nothing about asbestos, ask.
What to have ready
- what you know about when the pool was built, and any old approvals or certificates
- access to the pump shed, filter area and side paths
- where the septic system, water lines and power runs are, if you know
- what you plan to do with the space, because a lawn and a future slab need different fill and compaction
Photos before work
Ask for a shared, dated photo record of the pool, surrounds, fences, driveway and nearby buildings. If a question about damage comes up later, both sides have the same starting point.
What the written quote should contain
- full removal or partial fill-in, the approval route, who lodges it and whether the fee is included
- exactly what is removed, including pipes, cabling, equipment, surrounds and fence
- the disposal facility for each waste stream, and receipts showing your address
- the fill type, volume and compaction method, and any testing or engineer’s sign-off
- asbestos testing and removal, or a named exclusion
- rock or hard-dig terms, wet-weather terms and the payment schedule
- the finished surface, and who asks council to update the Swimming Pool Register
Ask for licence and insurance details in writing, and check any licence you are given on the NSW Government’s home building licence check. Removal alone is generally treated as demolition, which the Home Building Act 1989 excludes from home building work (Legal Aid NSW, Home building and renovating FAQs), but the electrician disconnecting the pool’s power needs a licence whatever the cost (NSW Government, Electrical work), and any new retaining wall, paving or deck in the quote is building work with its own licence and contract rules. The pool removal cost guide has published price ranges, the full pool removal and concrete pool removal pages describe a complete scope, and the process and timeline guide shows what follows.
FAQs
Do I need to be home for the site inspection?
It helps. Some questions only you can answer, such as when the pool went in, where private lines run and what you want afterwards.
Can I get a firm price without an inspection?
A figure from photos or a phone call is a rough guide, not a firm price. Rock, access, services and asbestos are what move a quote, and most of them need a visit.
Is the inspection free?
That is up to the contractor. Ask before the visit whether any fee applies.
What if the contractor finds something unexpected?
It should be addressed in the written quote, either as an included allowance or as a named exclusion with the rate that will apply.
Request a quote: your enquiry may be passed to an independent licensed contractor, who arranges the inspection and quotes in their own name.
Sources
- Before You Dig Australia, For homeowners: free enquiry, indicative plans, private locators. Checked 15/11/2026.
- NSW Planning, Demolition of buildings: exempt and complying demolition, pre-1987 asbestos. Checked 15/11/2026.
- Wingecarribee, Heritage and Development: consent for demolition on heritage sites. Checked 15/11/2026.
- Subsidence Advisory NSW, Mine Subsidence Districts: declared districts. Checked 15/11/2026.
- SafeWork NSW, Asbestos: licensing thresholds and use period. Checked 15/11/2026.
- NSW Government, Checking your contractor or tradesperson is qualified: home building licence check. Checked 15/11/2026.
- Legal Aid NSW, Home building and renovating FAQs: demolition work generally not home building work (last updated March 2026). Checked 16/11/2026.
- NSW Government, Electrical work: licence needed for any electrical wiring work regardless of cost. Checked 16/11/2026.