Southern Highlands Pool Removals is an independent referral service and does not perform or contract for the advertised work. Your enquiry may be referred to an independent contractor. Where licensing is required, the contractor's identity and licence details will be provided before you accept a quotation or enter a contract.

Flood mapping does not change the basic approval rule for removing a pool in NSW: removal is exempt only where the pool could have been built as exempt development, and otherwise needs a complying development certificate (CDC) or a development application (DA) (NSW Planning, Demolition of buildings). Where it matters is in the detail: how the hole is filled and graded so it does not hold or redirect water, and where the pool water goes. The first step is to find out whether your lot is mapped, which for a Wingecarribee property starts with a planning certificate.

How to check a Wingecarribee property

Wingecarribee says a Section 10.7 Planning Certificate “will indicate whether the land is within the mapped Flood Planning Area or the Probable Maximum Flood extent”, and that for properties mapped as flood prone, a Flood Certificate gives more detailed local flood risk precincts and flood levels (Wingecarribee, Flood Studies). Council also warns that outside the areas its studies cover, “the status of flood affectation is unknown, and flood-related development controls may still apply” (same page).

Council’s studies include:

  • an overland flow study for the Wembley Road and Farnborough Drive catchments in Moss Vale, adopted 13 September 2017
  • a review of the Wingecarribee River flood study, from upstream of Wingecarribee Dam to Wallaby Rocks at Berrima, adopted 20 July 2022
  • the Bowral floodplain risk management study and plan for the Mittagong Creek catchment, completed 2009
  • studies for the Nattai River (Mittagong), Nattai Ponds, Gibbergunyah Creek, Whites Creek and Robertson Village

Source: Wingecarribee, Flood Studies. The certificate, not the suburb name, tells you whether your lot is affected.

In Wollondilly

Wollondilly says “Picton has a long history of flooding” in the Stonequarry Creek floodplain, adopted the Stonequarry Creek (Picton) Floodplain Risk Management Study and Plan in June 2020, and adopted a shire-wide Wollondilly Flood Study in May 2026 (Wollondilly, Flood management). Picton is also a declared Mine Subsidence District (Subsidence Advisory NSW), so a Picton lot can carry both constraints. Ask Wollondilly council how to check a particular property.

Does flood mapping change the approval?

It does not change the test for exempt, CDC or DA. Flood controls can still shape the conditions. Tell the certifier the lot is mapped, and ask whether the conditions will set a finished level, a grading requirement or anything about fill on flood-prone land. If you may build over the area later, raise that too, because flood-related controls can also apply to a later building.

Backfill and grading on flood-prone land

The NSW Demolition Code requires the site of a removed pool to be restored to the adjoining ground level with compacted fill. Kiama Council’s fact sheet on the state rule allows only certified clean fill or certified excavated natural material, well compacted, with receipts kept (Kiama Council, Removal of a swimming pool). On a mapped lot, three points deserve attention at the quote:

  • No new low point. Fill that settles can leave a hollow that holds water after rain. Ask how the contractor will compact in layers and finish the surface so it sheds water.
  • Respect the flow path. If overland flow crosses the yard, the finished ground should not block it or push it toward a neighbour. Show the contractor where water runs in heavy rain.
  • Drains and connections. New surface drains or stormwater connections may need separate approval; the stormwater guide covers this.

The pool excavation and backfill page explains fill, compaction and testing.

Pool water near a watercourse

NSW Health’s guidance on pools after floods says the local council “needs to be consulted as to where the pool contents may be discharged”, and that pumping a pool to the sewer is not appropriate (NSW Health, Cleaning swimming pools after floods or storms). It also warns that pumping out a flooded pool straight away may cause more structural damage than leaving it full. Ask council where your pool water may go before the pump starts, and do not let it run toward a creek or onto a neighbour’s land. The dewatering guide covers drain-down.

If the pool has been flooded, NSW Health also advises having a licensed electrician check the electrical equipment and making sure the fence is intact or access is restricted. The NSW SES says to contact it on 132 500 for emergency help during a flood or storm, and Triple Zero (000) in a life-threatening emergency (NSW SES).

What drives the cost

No published price is specific to flood-prone lots. Extra fill to a set level, extra grading or drainage, and wet-weather standby are what can change a quote; ask for each to be priced separately. The pool removal cost guide has the published ranges.

Frequently asked questions

How do I find out if my Moss Vale property is flood prone?

Apply for a Section 10.7 Planning Certificate from Wingecarribee, which shows whether the land is in the mapped Flood Planning Area or the Probable Maximum Flood extent; a Flood Certificate gives more detail for mapped land.

Does flood-prone land mean I need a DA to remove a pool?

Not by itself. The approval route is set by the state rule; flood controls can affect the conditions, so tell the certifier the lot is mapped.

Can the pool water go into the creek or the sewer?

Ask council first. NSW Health says council needs to be consulted on where pool contents may be discharged, and that pumping a pool to the sewer is not appropriate.

Will the filled area have to be raised above flood level?

Only if your approval conditions or a later building approval require it. Ask the certifier before the fill is designed.

Request a quote and say if your lot is flood mapped; your enquiry may be passed to an independent licensed contractor who inspects and quotes in their own name. The full pool removal page covers the rest of the job.

Sources

Last reviewed 15/11/2026. How these pages are researched and corrected.

More guides

Frost, Ground Heave and Pool Backfill in the Southern Highlands

How Southern Highlands frost and wet winters affect pool backfill: BOM frost-day figures for Moss Vale and Bowral,…

View

Geotechnical (Soil Investigation) Reports After Pool Fill-In: When You Need One and What It Covers

When a geotechnical or soil report is needed after a pool fill-in in NSW: building over the fill, approval…

View

Section 68 Approval and Pool Removal in Wingecarribee: When It Applies

Section 68 approval and pool removal in Wingecarribee: why the demolition itself goes through a CDC or DA, and when…

View

More on this topic

Request a quote

Tell us about the job and an independent local contractor can quote it.

Get a Quote