On a flat block a filled pool needs no retaining wall: the surrounding ground holds the fill in place. A wall comes into it on a sloping block, where the pool was cut into the hill and its shell was holding the ground back, or where the finished surface has to step down to meet lower ground. Whether one is needed, how high, and under which approval is a question for an engineer and the certifier, and it is best answered before the removal is quoted.
What the removal itself requires
Under the NSW Demolition Code, removing a pool means removing its piping and restoring the site to the ground level next to the pool with compacted fill (NSW Planning, Demolition of buildings). Kiama Council’s fact sheet on the state rule adds “considering any sloping of the site”, says the fill must be well compacted, and allows only certified clean fill or certified excavated natural material (Kiama Council, Removal of a swimming pool fact sheet). On a slope, matching “the adjoining ground level” can mean a different level on each side, which is where a wall or a battered slope may be needed.
Three situations where a wall comes up
The pool was retaining the hill. Where the pool was cut into a slope, its walls may have been holding back the higher ground. Once the shell goes, that support goes with it, so the engineer may need a new wall built before or during the removal, not after.
An existing wall beside the pool. Kiama’s sheet says removing ancillary structures such as decking or retaining walls may need prior development approval unless they were built under the exempt provisions of the Codes SEPP (Kiama Council fact sheet). Tell the certifier about any wall that will be removed, altered or relied on.
A level change at the edge of the fill. If the finished area is to be flatter than the natural slope, a low wall or a graded batter at the downhill edge holds the new surface. The steep gradient guide covers access and excavation on sloping sites.
Approval for the wall
NSW Planning’s exempt development standards for earthworks, retaining walls and structural supports include that they must not be on or in a heritage item, must be in the rear yard in a heritage conservation area, must be at least 40 m from a body of natural water, must not redirect surface or ground water or send sediment onto a neighbour’s land, and must be at least 2 m horizontally from any other retaining wall on the site. The page also says all works must be structurally adequate and comply with the Building Code of Australia (NSW Planning, Earthworks, retaining walls and structural supports). Height and setback limits are in the Codes SEPP itself; a certifier can confirm whether your wall meets them.
Wingecarribee says a complying development certificate may cover retaining walls on land zoned R1, R2, R3, R4 or RU5 if the proposal meets all the relevant development standards, and that otherwise a development application must be lodged (Wingecarribee, Retaining Walls). On a heritage item, Wingecarribee says complying development is not available for locally listed items (Wingecarribee, Heritage and Development).
In a declared Mine Subsidence District, which includes Bargo, Picton and Wilton, approval from Subsidence Advisory NSW is needed before building a structure (Subsidence Advisory NSW, Mine Subsidence Districts), so check with it before building a wall there.
Engineering and drainage
On any significant slope, the wall’s design should come from an engineer who knows the soil, the height of fill being retained and what will sit above it. A geotechnical report may be part of that. Drainage behind the wall matters as much as the wall: water trapped in the fill adds pressure, and the exempt standards above say the work must not redirect water or move sediment onto neighbouring land. Ask how water behind the wall will be collected and where it will discharge; the stormwater guide covers the outlet side.
Getting it into the quote
Retaining work is often left out of a basic removal quote. Ask each contractor to say in writing whether a wall is needed, who designs and approves it, whether it is included, and how it will be drained. What drives the overall price is covered in the pool removal cost guide; no published source gives a retaining wall figure for a pool fill.
Frequently asked questions
When is a retaining wall needed after a pool fill-in?
When the site slopes enough that the fill or the ground above it needs holding back, most often where the pool was cut into a hill. An engineer decides, and the certifier sets any condition.
Can the old pool coping or shell be left as a retaining wall?
Kiama Council’s explanation of the state rule says remnants of the shell cannot be left in the ground and coping cannot be used as fill (Kiama Council fact sheet). Keeping part of the structure in place generally needs a DA; ask council or a certifier.
Do I need approval for a low retaining wall?
Possibly not, if it meets every exempt development standard in the Codes SEPP, including the heritage, water and separation rules (NSW Planning). If it does not, Wingecarribee says a CDC or a DA is needed (Wingecarribee, Retaining Walls).
Can the wall be built as part of the pool removal job?
Often, if the contractor or a subcontractor is set up for it. Ask for the wall to be itemised separately, with its design and approval named.
Request a quote for a removal on a sloping block; your enquiry may be passed to an independent licensed contractor who inspects and quotes in their own name, with the backfill and any retaining work set out.
Sources
- NSW Planning, Demolition of buildings: pipe removal and compacted fill under the Demolition Code. Checked 15/11/2026.
- Kiama Council, Removal of a swimming pool fact sheet (PDF, 2021): sloping sites, fill, ancillary retaining walls (Kiama’s explanation of the state rule). Checked 15/11/2026.
- NSW Planning, Earthworks, retaining walls and structural supports: exempt development standards (updated 23 March 2026). Checked 15/11/2026.
- Wingecarribee, Retaining Walls: CDC or DA for retaining walls. Checked 15/11/2026.
- Wingecarribee, Heritage and Development: complying development and heritage items. Checked 15/11/2026.